MGN 372: Navigating near offshore wind farms
Guidance on planning and making a passage near offshore renewable energy installations (mostly wind farms) in UK waters: how they are marked and lit, how they affect radar, safety zones, and whether to go round or through.
Summary, not the notice. This is a plain-English summary of the official notice for revision. It is not legal advice and does not replace the notice: always read the current version on GOV.UK.
About this notice
- Official title
- MGN 372 Amendment 1 (M+F) Safety of Navigation: Guidance to Mariners Operating in the Vicinity of UK Offshore Renewable Energy Installations (OREIs)
- Type
- Marine Guidance Note (MGN). MGNs give guidance and recommendations on good practice, often explaining how to meet the regulations.
- Marked
- (M+F): for merchant ships and fishing vessels
- First published
- 4 November 2022
- Last updated on GOV.UK
- 4 November 2022
- Status
- Current Current on GOV.UK when last checked (27 November 2026).
Who it applies to
Government departments, offshore renewable developers, port authorities, ship owners, masters, ships' officers, fishermen, rescue organisations and recreational sailors. "Mariner" includes crew and users of all vessel types and personal watercraft.
Key points
- Read it with the guidance on voyage planning under SOLAS V Regulation 34; urgent safety information on installations is given by Notices to Mariners and radio navigational warnings (paragraphs 1.5 and 1.8).
- Significant peripheral structures on the edge of a wind farm show synchronised lights visible all round, with an IALA special mark character, flashing yellow, range at least 5 miles (2.2).
- Turbines are at least 500 metres apart; smaller craft may be able to navigate inside the boundary, larger craft will need to keep clear (2.8.1).
- Turbines can produce multiple reflected and side lobe radar echoes that can mask real targets, from about 1.5 miles off (2.9.2).
- It is prudent for larger vessels to plan tracks at least 2 miles clear of turbine fields (2.9.6).
- The lowest point of the rotor sweep must be at least 22 metres above Mean High Water Springs (2.10).
- Safety zones of up to 500 metres may be set; do not enter one except to save life or property, because of stress of weather, or in distress (4.1 and 4.9.1).
- If you have an emergency such as engine or steering failure near an installation, tell HM Coastguard immediately (4.10.1).
- Where there is enough sea room it is prudent to avoid the area completely; otherwise go round the edge or through with caution (4.11).
Paragraph numbers refer to the official notice. Summarised from the version on GOV.UK last updated 4 November 2022.
Why it matters for your oral
Offshore wind farms were flagged as a syllabus gap and are increasingly asked about. Know how the boundary turbines are lit (flashing yellow, special mark), the radar problems close to turbines, the 2-mile planning margin for large ships, safety zones, and what to do if you lose power nearby.
What the examiner might ask
Try answering out loud before you open each one.
1You are passage planning past an offshore wind farm. What do you consider?
Keep well clear: MGN 372 suggests larger vessels plan tracks at least 2 miles off turbine fields. Check charts, Notices to Mariners and navigational warnings for new structures and safety zones, allow for radar clutter and false echoes near the turbines, small craft working inside, and plan what to do if the engine or steering fails, which means informing the Coastguard immediately.
Related notices
Try it free
No card needed. Have a go, then decide.
These are a few of our 93 revision cards
Ticket Trainer has a card for every syllabus topic and 37 trainers to drill them: spaced-repetition oral questions, lights and shapes, COLREGs situations, buoyage, radar plotting and a mock examiner who marks your answers like the real oral. Every trainer has a free sample.